Wednesday, May 13, 2015

We've Really Slowed Down... But Still Finishing Up That Kitchen

So since the kitchen is totally functional and pretty amazing, we have totally slowed down.  We are close to done, but just a little left to do.

On the to do list is just:
  • attach cabinet toe kicks
  • add door trim and baseboards
  • install crown above cabinets
  • finish installing the under cabinet LED lighting strips
  • finish installing power outlet on island 
  • choose and install a back splash of some sort
  • and soooome day we will open up the wall between the living room and kitchen to make a bar top, but no rush on that.

We finally put all the pulls on (except one, can you find it?).  The under cabinet trim pieces were put on as well.


The drawer for recycling in the island is up and running.  What a convenience!  This originally was designed to house our trash, but we like our old trash can that we operate with our foot and it has a nice location too.  This was a welcome change of plan.


Every upper cabinet has these awesome power strips under them instead of a socket in the back splash.  We bought different lengths depending on the cabinet it went under.  We did a little outlet overkill, but that's ok.  It's better to have too many than not enough where you need it.  Plus they are hidden, so why not?


Also the dishwasher is so cool with the built-in door panel attached.  So fancy.  ;)


I love having my little breakfast bar area for cooking bagels and making my daily iced caramel macchiatto!  These two items used to take up the entire counter in the last kitchen.  So, it's nice having their own area off to the side.



Thanks for following up!